Subsurface & drilling
Formation-aware drilling performance — predicting the conditions that cause non-productive time before the bit reaches them.
Unplanned time is the costliest part of the well
Non-productive time is one of the largest costs a drilling programme carries. Stuck pipe, lost circulation and wellbore collapse account for most of it — and all three are formation problems before they are equipment problems.
The offset wells already knew
The conditions that cost the days were usually drilled through before, in a nearby well, and written down. That record lives in daily drilling reports, mud logs and end-of-well summaries that nobody re-reads at planning time.
The programme is fixed; the formation is not
A pre-spud plan is built once, from the best picture available then. The mud weight and casing point decisions that actually determine the outcome get made later, on the rig floor, from whatever is on the screen at the time.
Read the offset wells before the bit does.
We turn what nearby wells already recorded into a depth-by-depth risk forecast, and keep it current while you drill.
Every offset well, finally readable
Daily drilling reports, mud logs, well logs and end-of-well summaries, including the free-text notes, are organised by depth and formation into one searchable record.
Risk forecast by depth
Models predict where stuck pipe, lost circulation and wellbore instability are likely along the planned well path, with the offset evidence behind each warning.
The plan keeps up with the formation
Agents compare live rig data against the forecast, flag drift early and draft revised mud-weight and casing-point options. The drilling engineer decides.
Built with your drilling team
Our engineer works alongside your planners and rig-site team, on your well data, until the system is part of how every well is planned and drilled.
Questions you can ask
Where along the planned well path is stuck pipe most likely? Which offset wells recorded trouble in this formation, and what happened? Is the live data drifting from the forecast, and what are the mud-weight options?
What you receive
Depth-by-depth NPT risk profile. Offset-well evidence on demand. Live drift alerts. Mud-weight and casing-point options for review.